BATUMI NUROL RESIDENCES MATERIAL LIST

ARCHITECTURAL AND CONSTRUCTIONAL SYSTEMS:

CONSTRUCTON SYSTEM
Earthquake safe mat foundation, reinforced concrete shearwalls and industrial formwork systems

FACADE
Aluminium curtain wall front facade, on the other facades, paint over glass fiber reinforced concrete facade panels over exterior thermal sheating or plaster and paint, according to the detail of the related facade.

INSULATION SYSTEMS
exterior thermal sheating
sound insulated flooting screed between the floors

FLOOR FINISHES
Entrance, kitchen, corridor, balcony, bathroom: ceramic tile
Living room and bedrooms: laminated parquet
Stairs, halls: marble
Technical spaces: ceramic tile

WALL FINISHES
Living rooms, entrance, corridor, kitchen and bedrooms: water based paint
WC and bathrooms: ceramic tiles
Stairs, halls and other common spaces: plastic paint
Technical spaces: plastic paint

CEILING FINISHES
WC and bathrooms: lameled suspended ceiling
Living room and bedrooms: water based paint

WINDOWS AND BALCONY DOORS
Aluminium and/or PVC, according to the related detail

DOORS
Apartment entrance door: wooden covered steel door
Interior doors: panel door

KITCHENS
Kitchen cabinets and equipment according to the project: suitable hood, sink, electrical stove (Arçelik, Beko or equal)

BATHROOMS
Fixture: AR fixtures
Water Closets: SEREL
Sink: SEREL half foot sink, full foot sink or bowl sink with cabinet according to the related detail of the project
Bathtub and shower cabinet: POLITEK brand according to the project

MECHANICAL SYSTEMS
SANITARY SYSTEM

DOMESTIC HOT WATER SUPPLY
Domestic hot water will be provided from the Wall Mounted Hermetic (C4) Gas Boiler. (Gas Boiler will be procured by the owner)

DOMESTIC COLD WATER SUPPLY
Booster water pump will be installed

WATER TANK
50 Ton Central Modular water tank will be installed
Waste water Pump will be installed against flood

NATURAL GAS SYSTEM
Natural Gas network will be installed
Natural Gas network will be installed for Kitchens
Quadro Chimney System (Steel) will be installed for the C4 Hermetic Gas Boilers.

HEATING AND COOLING SYSTEM
Hermetic type gas boilers will be installed.
Hot Water required for the radiators will be provided by the C4 Hermetic Type Gas Boilers.
Split Type Air Conditioners will be installed by the owners.

ELEVATOR
No Elevator, 800 Kg Capacity, h=29,78m, 10 people, 10 stop, with a speed of 1m/sec, Stainless Steel and Wood decorated, with machine room,

ELECTRICAL SYSTEMS

TV & TELEPHONE
In living rooms,kitchens and every room telephone, modem and cable tv will be provided.
Intercom with
Between the main gate and every flat there will be intercom facility with screen.

SECURITY
In this project there is no security system. Only a simple facade illumination is considered.

FIRE DETECTION SYSTEM
In this project only gas detectors in the kitchen are considered, the gas flow will be controlled through a soleneid valve controlled by the gas detector in every flat.